The ship "PRETTY KEEL" smoothly sailed into the sea from Shanghai COSCO, indicating the successful delivery of the PANASIA BWTS which is designed, constructed, and commissioned by Wahtung to the shipowner and crew.
01Handle Unexpected Situations with Seriousness
Due to the unpredictable weather conditions, the ship's dry docking period has been significantly delayed, but the ship's voyage was scheduled in advance. After receiving a request from the shipowner, our company actively coordinated with the shipyard and the shipowner to ensure the ship's departure from the dock.
02 Actively coordinating to ensure the sailing schedule
After the ship's departure from the dock, the engineers promptly explained the structure, principles, and subsequent maintenance of the equipment to the crew on-site. Both parties actively communicated, and the training time for system operation was significantly reduced.
03Focus on details and ensure quality and quantity
Despite the shortened operation time, on-site engineers are diligent and responsible. They work overtime and conduct repeated inspections to ensure that in future ship voyages, Wahtung PANASIA's ballast water treatment equipment will provide perfect support.
04Forge ahead and strive continuously
This 35,000-ton bulk carrier will play a self-effective role in protecting marine water quality in the future, and Wahtung PANASIA equipment will also contribute to marine conservation efforts.
Contact: Feng Chunguang
Phone: 18117576189
Tel: 0511-88029569
Email: fengchunguang@wahtung.net
Add: No.18 ChuangXin Road, BaQiao, YangZhong, JiangSu, P.R.China